
Core Electrical Supply
Instrument transformers
CT / PT applications
Current transformer (CT) and potential transformer (PT) interfaces for measurement and protection, selected against ratio, burden, accuracy and insulation requirements.
Manufacturer photograph
Inspect the product itself.
The image above is AI-lit from this manufacturer photograph for presentation, and no specification is read from it. Use the six views to inspect the manufacturer image, its close view, interfaces, system context, drawing gate and evidence boundary.

PRODUCT IMAGE · 01/06Instrument transformersProduct image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.
IMAGE REFERENCEProduct imageRatings, dimensions, interfaces and compliance are confirmed from the applicable documents.
Instrument transformers: what the design sets.
A project-configured item: its ratings come from the approved design, not from a published product sheet.
| Model | CT / PT applications |
|---|---|
| Type | Instrument transformers |
| System family | Core Electrical Supply |
| Set by the approved design |
|
Evidence level: project details needed. Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.
One link in the supply chain from utility to load.
Every piece of core electrical equipment is sized against the pieces either side of it. The ratings that matter are set by the project single-line diagram.

Power path
- Utility supplyWhere the project connects.
- SwitchgearSwitching and protection for the incoming supply.

- Distribution transformerSteps the voltage down for the site.

- This productInstrument transformersScale current and voltage for metering and protection.

- Meter base or enclosureHouses the revenue meter.

- Site loadsThe building or plant being supplied.
What sets the rating
Metro Power matches these against the approved drawings before sourcing.
- Voltage and fault level
The system voltage, the available fault current and the insulation level at the point of installation.
- Load and growth
The present demand, the expected growth and any motor starting or harmonic load.
- Site and standard
Indoor or outdoor, pole or pad, and the utility or client specification that governs acceptance.
Application context
Where this product fits.
Typical applications for this product family. Fit still depends on the exact service, duty, operating objective and approved configuration, so treat these as starting points rather than recommendations.
- 01Electric-cooperative projects
- 02New service and expansion
- 03Metering installations
- 04Distribution upgrades
- 05Commercial and industrial facilities
- 06Substation support
Before an offer
What Metro Power confirms before Instrument transformers is offered.
Three steps, in the order they happen: what the public record already shows, what your project must confirm, and the controlled documents that close the loop.
01Professional documentation
One product identity. Five controlled evidence gates.
This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.
02Configuration gate
What must be confirmed before an offer.
Brands, ratings, standards, test requirements and supply scope are released only after review of the current approved project documents.
- 01Approved single-line diagram
- 02System voltage and fault level
- 03Load and duty requirements
- 04Equipment ratings and standards
- 05Site and environmental conditions
- 06Bill of quantities (BOQ), drawings and delivery sequence
03Controlled document request
Request a controlled offer.
Need the current datasheet or compliance evidence? Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.