
Decision resources · Free, no account
Take the reference into the room with you.
Seven controlled documents and five printable preparation lists, all free, all downloadable, none of them requiring an account. Below them, a searchable library points to the exact place on this site where each question is answered in full.
01What you can take away today
Seven documents you can read without this website open.
- 01Second edition · Electric metering & AMIUnderstanding AMI: From Meter Reading to Utility IntelligenceWhat separates a smart meter, automated meter reading and a complete AMI operating system, and what a representative pilot has to prove before a rollout decision.
- 02Second edition · Water meteringSmart Water Metering: Turning Flow Data Into Utility ActionWhy pipe size, pressure, flow range and installation position decide a water-metering project before radio coverage or analytics do.
- 03Second edition · BESS & microgridsBESS and Microgrids: A Practical Guide to Power, Energy and ControlHow power rating, stored energy, controls, protection and acceptance criteria have to agree before a storage project is costed.
- 04Second edition · EV chargingEV Charging Infrastructure: Designing the Whole SiteThe whole site rather than the charger: service capacity, cable routes, managed demand, connector types and who operates the service.
- 05Second edition · Conventional meteringConventional Electric Metering: Protecting the Measurement ChainService configuration, meter form, instrument-transformer arrangement, sealing and the acceptance tests that keep revenue measurement defensible.
- 06Second edition · Core electrical supplyCore Electrical Supply: From Approved Design to EnergizationWhat an approved single-line drawing has to carry, and how ratings, submittals, interfaces and delivery sequence control the supply.
- 07Version 5.1 · Issued 22 September 2026AMPERE Protocol: the complete modernization frameworkSix controlled stages, five decision gates, four workstreams and the evidence methods used to prepare a utility decision without treating the framework as an approval.
Print and write on it
Five preparation lists for the meeting itself.
Each checklist saves what you type in your own browser, on your own device. Nothing is sent to Metro Power until you choose to send it.
Start with what you need to decide.
You do not need to know a product name or technical term. Choose the outcome closest to your work, then narrow by system or search in your own words.
9 of 29 matching resources shown
Search and filterChoose a topic or phrase
Energy systems glossary
Search 100 plain-language definitions, then continue into the architecture, readiness question or project decision where each term matters.
Open quick reference ↗02Planning tools · PlanInteractive toolEnergy Project Planning Lab
Shape a plan for EV charging, battery storage, smart water or an AMI pilot. Answer only what you know and get a plain-language summary, the gaps and the next actions.
Open interactive tool ↗03Delivery · OperateQuick referenceHow Metro Power engagements work
Compare four engagements, from AMPERE readiness and TOR review to project delivery and after-sales support, with the inputs, stages, outputs and decision gate for each.
Open quick reference ↗04Decision guide · PlanInteractive toolFind your project pathway
Six questions, one saved record: what must improve, which system, which decision, where the work stands and how reliable your information is. It ends with a named first action.
Open interactive tool ↗05Insights · UnderstandField guideEnergy infrastructure field guides
Six field guides on the decision behind the equipment, across AMI, water metering, BESS, EV charging, conventional metering and core electrical supply.
Open field guide ↗06AMI · UnderstandQuick referenceWhat AMI actually includes
A smart meter records; AMI helps the utility respond. See how meters, communications, HES, MDMS and utility workflows form one operating system.
Open quick reference ↗07AMI · UnderstandTechnical paperUnderstanding AMI: complete technical paper
Study the full field-to-utility operating chain, pilot evidence, governance and customer value.
Open technical paper ↗08AMI · UnderstandQuick referenceAMI end-to-end architecture
Follow measurement from the field into controlled utility action.
Open quick reference ↗09AMI · EvaluateQuick referenceAMI readiness assessment
Check six conditions a cooperative can confirm today, from meter population to success criteria, and see which stage the AMI project has reached.
Open quick reference ↗10Metering · UnderstandQuick referenceConventional metering fundamentals
Understand service configuration, meter form, sockets, CT/PT arrangements, testing and sealing.
Open quick reference ↗11Water · UnderstandQuick referenceDigital water-metering architecture
See how pipe conditions, ultrasonic measurement, communications and utility workflows connect.
Open quick reference ↗12Water · UnderstandTechnical paperSmart water metering: complete technical paper
Study hydraulic fit, data, alerts, DMA applications, pilots and consumer value.
Open technical paper ↗13Water · UnderstandField guideDigital water metering starts with hydraulic fit
Understand why pipe, pressure, flow range and installation conditions come before radio and analytics.
Open field guide ↗14BESS · UnderstandQuick referenceBESS and microgrid architecture
Learn how batteries, BMS, PCS, EMS, protection and site loads work as one system.
Open quick reference ↗15BESS · UnderstandTechnical paperBESS and microgrids: complete technical paper
Study power, energy, controls, data, safety, economics and acceptance.
Open technical paper ↗16BESS · PlanQuick referenceBESS readiness inputs
See the bills, interval load, critical loads, site and interconnection information that frame a storage project, and what to do when an item is not yet available.
Open quick reference ↗17EV charging · UnderstandQuick referenceEV charging site architecture
See the complete path from utility service to charger, software and vehicle.
Open quick reference ↗18EV charging · UnderstandTechnical paperEV infrastructure: complete technical paper
Study the whole site, managed demand, OCPP, Philippine pathway and operating model.
Open technical paper ↗19EV charging · PlanQuick referenceWhole-site EV feasibility
See the inputs that frame a charging site, from the vehicle list and duty cycle to service capacity, cable routes, grounding (earthing) and the operating model.
Open quick reference ↗20Electrical · UnderstandQuick referenceCore electrical-supply architecture
Follow approved design, system data, equipment release, delivery and energization.
Open quick reference ↗21Metering · UnderstandTechnical paperConventional metering: complete technical paper
Study the service, CT/PT, meter, field acceptance and revenue-measurement chain.
Open technical paper ↗22Electrical · UnderstandTechnical paperCore electrical supply: complete technical paper
Study design authority, interfaces, submittals, logistics, commissioning and handover.
Open technical paper ↗23Electrical · ProcureField guideElectrical supply is a system decision
Learn how approved design, ratings, interfaces, documents and delivery controls shape responsible equipment supply.
Open field guide ↗24Readiness · EvaluateInteractive toolInteractive readiness center
Rate how reliable each piece of information is for an AMI, BESS, EV charging, water or conventional-metering project, and turn every gap into a named next action.
Open interactive tool ↗25Public education · UnderstandQuick referencePaliwanag sa Filipino
Maikling paliwanag tungkol sa AMI, metering, water, BESS at EV charging para sa nontechnical stakeholders.
Open quick reference ↗26Procurement · ProcureQuick referenceHow Metro Power controls evidence
Follow the six controls, from requirement and source to delivery, acceptance and support, that sit behind each Metro Power commitment.
Open quick reference ↗27Products · ProcureQuick referenceSearch and compare products
Search the documented product catalog by requirement, compare up to three products in one family and request the exact project configuration.
Open quick reference ↗28Academy · UnderstandLearning pathwayEnergy Systems Academy
Choose one of six structured courses. Each lesson pairs a technical visual and worked example with a knowledge check and a responsible next step.
Open learning pathway ↗29Academy · UnderstandLearning pathwayTechnical paper library
Read six controlled second-edition papers on AMI, water metering, BESS, EV charging, conventional metering and core electrical supply, starting from the decision closest to your work.
Open learning pathway ↗20 more resources match this view.
Continue in manageable groups, or reveal every matching resource.
AMPERE readiness workshop
Need your team aligned around AMI?
AMPERE turns executive, technical and operating questions into a structured readiness discussion.






