Comcore TC25E three-phase smart electricity meter with RF communications options, lit from the upper left on a dark floor
Comcore TC25E Series, RF communications optionProduct image, AI-lit from manufacturer photograph, not an installation

RF Mesh AMI for Philippine electric cooperatives

One field. Many ways through.

Metro Power supplies the meters, RF Mesh communications, data concentrators, and system support needed to help a cooperative plan an AMI network around real field conditions.

RF MESH AMI · FLAGSHIP ARCHITECTURE

Follow one reading through RF Mesh to a decision.

01 / 06 · Record

A meter records the reading.

An RF-capable meter records energy at the service. The reading and its time must be usable before a network can add value.

  1. 01RecordA meter records the reading.An RF-capable meter records energy at the service. The reading and its time must be usable before a network can add value.
  2. 02ConnectNearby meters come online.Commissioned meters form the local field. Each participating meter needs a tested radio link.
  3. 03RelayThe reading moves through the field.RF Mesh can pass a reading across available neighboring meters toward a data concentrator.
  4. 04ObstructionOne route becomes unavailable.Buildings, terrain or interference can interrupt a path. This illustrated break is a question for the field study, not a site result.
  5. 05AlternateAnother route may carry the reading.Where viable neighboring hops exist, the mesh can reach the concentrator by a different route. A pilot must prove this locally.
  6. 06UseThe reading becomes a usable record.The concentrator forwards data to the head-end and meter-data systems. Utility teams can validate it for billing, service, loss investigation or planning.

What must a pilot prove?Can readings from difficult locations reach the concentrator, pass through the data systems, and support a named team's decision? The illustrated alternate path is not evidence of local performance.

See the five pilot decision gates

AMI in one clear idea

A smart meter records.
AMI helps the utility respond.

Comcore TA15 single-phase smart meter with keypad, lit from the upper left on a dark floor
Comcore TA15 Series single-phase smart meter

Advanced metering infrastructure (AMI) connects meters, two-way communications, collection platforms, data management and utility workflows into one operating system.

The practical test: if the information does not improve billing, loss investigation, service or planning, the project has installed technology without creating enough operating value.

UTILITY OPERATING VALUE

One AMI system.
Two sides of value.

Choose a perspective to see how the same field-to-system architecture can improve utility work and the customer relationship. Benefits depend on the deployed functions, integrations and operating procedures.

UTILITY OPERATING VALUE

Turn field signals into accountable utility action.

Comcore NA67 Series ANSI round smart electricity meter, product imageSMART METER
READS · EVENTS · COMMANDS
COOPERATIVE WORKFLOWSBilling · loss · service · planning
AMI improves information and service capability. It does not guarantee a lower bill; customer cost still depends on consumption, tariff and available utility programs.
01

Meter-to-bill evidence

Scheduled reads, validation and exception workflows can strengthen billing evidence.

↗
02

Loss intelligence

Interval data and events can help teams focus investigation where evidence points.

↗
03

Service awareness

Supported outage and device events can reach responsible teams sooner.

↗
04

Governed remote work

Authorized functions can reduce selected field visits when controls are in place.

↗
WHAT MAKES THE VALUE REAL

Reliable communications, data-quality rules, integration, cybersecurity and named workflow owners.

Face of a single-phase smart electricity meter: the register display, three status lights, an orange optical port cover, a communications module bay with a SIM, the nameplate and the DLMS mark
  1. Register display: the kWh register the utility bills from
  2. Status lights: pulse output, power and modem status
  3. Optical port: a local read without the network
  4. Communications module: shown with a SIM, for the 4G model
  5. DLMS mark: the common meter data language

Comcore TA37 single-phase smart meter, 4G model · Product photograph

The data behind a reading

A meter sends more than a number.

This separate TA37 4G model lets you inspect the register, local reading port and communications module up close. The example below explains the types of records a head-end system can receive. The RF Mesh journey above uses a different, RF-capable meter.

Different meter, same data questionsActual records depend on model and configuration

What the head-end system receives
RecordWhat it holdsWhat it serves
Energy registerskWh read for billing. Total active energy imported is the standard register 1-0:1.8.0.Meter-to-bill evidence
Interval profileConsumption and demand recorded at the configured interval.The loss balance and planning
EventsOutage, voltage and device events the model supports.Service awareness
Tamper conditionsCover, magnetic field, neutral and reverse energy conditions the offered model supports.Revenue-protection review, never a verdict
Time stampThe meter's own clock on every read and event.Aligning supply and consumption in time
Relay statusRemote disconnect where specified. Commands return through a controlled, auditable path.Governed remote service

Which of these a given meter provides, and how each is reported, is set by its datasheet and its configuration, so each is confirmed in the specification.

01The system, end to endField devices, communications, the head-end system, meter data management and utility action, drawn as one chainDrawn
The complete AMI operating chain

Follow one reading.
See the whole system.

A smart meter is only the beginning. Scroll through the path from the customer connection to a utility decision, and the governed command that can travel back.

SCROLL TO ASSEMBLE THE ARCHITECTURE ↓
CURRENT SYSTEM STAGE
01Consumer connectionMEASURE
AUTHORIZED FIELD COMMAND
01SMART METERMeasure
02RF MESHPrimary network
03DCU / GATEWAYWhere required
04HESManage
05VEE + MDMSTrust
06NAMED TEAMSRespond
RF MESH PRIMARY · PLC + CELLULAR WHERE FIELD EVIDENCE REQUIRES
ENERGIZED
BILLINGLOSSOUTAGESERVICE
EXAMPLE INTERVAL00482.7kWh
TWO-WAY BY DESIGNMeasurements and events move to utility systems.↔Permitted commands return through a controlled, auditable path.
01MEASURE

Consumer connection

The smart meter records energy, demand, interval profiles, supported events and tamper conditions at the point of service.

THE NEXT HANDOFF MUST ALSO SUCCEED
02TRANSPORT

RF Mesh field communications

RF Mesh is the primary field network. Nearby meters relay information toward a concentrator; PLC or cellular support areas where field evidence calls for another route.

THE NEXT HANDOFF MUST ALSO SUCCEED
03AGGREGATE

Data concentrator or gateway

Where the architecture requires it, the data concentrator unit (DCU) manages local meter traffic and maintains a controlled utility uplink.

THE NEXT HANDOFF MUST ALSO SUCCEED
04MANAGE

Head-end system

The head-end system (HES) manages devices, schedules reads, handles exceptions and governs authorized communication with the field.

THE NEXT HANDOFF MUST ALSO SUCCEED
05TRUST

VEE and meter data management

Validation, estimation and editing (VEE) rules help the meter data management system (MDMS) store and prepare trusted data for billing, analytics and other utility systems.

THE NEXT HANDOFF MUST ALSO SUCCEED
06RESPOND

Accountable utility workflows

Named teams use the information for billing, loss investigation, outage awareness, customer service and network planning.

VALUE REQUIRES A NAMED WORKFLOW OWNER
METRO POWER VISUAL EXPLAINER

Watch the operating idea take shape.

Use this short film as orientation, then continue into the system architecture, technical lesson or readiness action.

AMI · Film 08 of 35 · 0:42

A smart meter is only the beginning

Follow the complete AMI chain from field measurement to communications, HES, MDMS and utility action.

Cooperative workflow ledger

Follow the evidence.
Know what happens next.

Choose a cooperative scenario. The ledger follows evidence from the field through platform review to an accountable operating response. It also shows the human ownership required at every step.

SELECTED WORKFLOWACCEPTED READ
01Comcore TC25E Series three-phase smart meterFIELD EVENTScheduled interval closesMeter evidence begins the workflow
02HES + MDMS REVIEWValidate, estimate exceptions and release an accepted readRules and data quality shape the decision
03RESPONSIBLE HANDOFFBilling and the customer information system (CIS) receive controlled consumption evidenceMetering · Billing · ICT
WORKFLOW PRINCIPLE

A signal creates value only when acceptance rules, authority, escalation and closure are defined before go-live.

Test this in the pilot plan ↗

From system view to design detail

The chain is connected.
Now inspect every layer.

The end-to-end architecture shows how information moves. This next view explains what each operating layer must contribute, and where weak design decisions can break the outcome.
Comcore TA15 single-phase smart meter, product photograph

kWhEnergy registers read for billing

Interval profileDemand record, at the configured interval

EventsOutage recording; other events depend on the model

TamperConditions the offered model supports

CONSUMER CONNECTION · WHAT THE METER RECORDS

01 / Field intelligence

The meter becomes a source of operational evidence.

Smart meters capture consumption, interval profiles, events and supported tamper conditions at the consumer connection.

  • Single- and three-phase meters
  • ANSI round and configured forms
  • Load profile and event records
  • Remote disconnect where specified

Where it breaksThe meter form, relay or event configuration does not match the service, so the evidence never exists.

01What changes inside the utilityRead-to-bill, loss intelligence and the other operating outcomes, written as capability pathways rather than savings claimsOutcomes

What changes inside the utility

AMI value is an operating behavior.

These are capability pathways, not guaranteed savings claims. Each outcome depends on configuration, data quality, integration and people acting through defined procedures.
Comcore TC35 three-phase smart meter with keypad, lit from the left on a dark floor
Comcore TC35 three-phase smart meter
  1. 01

    READ-TO-BILLFrom manual collection to controlled billing evidence

    Scheduled reads and exception handling support a more accountable meter-to-bill process.

    Control pointDefine acceptance, fallback and ownership, not just read frequency.

  2. 02

    LOSS INTELLIGENCEFrom broad loss concern to targeted investigation

    Interval data, events and network context can help teams narrow where investigation should begin.

    Control pointAMI supplies evidence; mapping, analytics and field action create the result.

  3. 03

    SERVICE VISIBILITYFrom delayed discovery to operating awareness

    Supported outage, voltage, tamper and device events can enter defined response workflows.

    Control pointEvery event needs a recipient, response rule and closure record.

  4. 04

    REMOTE OPERATIONSFrom truck roll to governed command

    Where specified, permitted actions may be executed remotely through controlled authority.

    Control pointCybersecurity, authorization, audit trails and safety rules are mandatory.

02Metro Power RF Mesh AMIHow neighboring meters relay information, plus the field evidence that determines where supporting routes are neededFlagship

Metro Power's flagship AMI architecture

RF Mesh first.
Hybrid where evidence requires.

Metro Power leads with RF Mesh because nearby meters can relay information toward a data concentrator without depending on the condition of the low voltage conductors or requiring a mobile subscription in every meter. The network still has to be proven against actual meter density, terrain, interference and hard-to-reach locations. PLC or cellular can support areas where the field evidence shows that another route is more responsible.
RF Mesh flagship architecture · supporting routes where requiredRF Mesh is the primary field network. The communications study identifies any responsible exceptions.
01RF MeshFLAGSHIP ROUTE · LoRa · Wi-SUN · sub gigahertz RF

Meters relay for each other

Meter to meter, hop by hop, to a data concentrator with its own backhaul.

Benefit: Reaches furthest: coverage grows with every neighbor, whatever state the wiring is in, and no operator is involved.

Trade off: Every hop adds delay and takes a share of the channel. A meter with no neighbor in range has nobody to relay for it.

Comcore publishes a multi hop coverage radius of 8 km for its LoRa mode and 3 km for its end to end multi hop mode.

02Power line carrierG3-PLC · HPLC

Data on the wires you already own

The reading rides the low voltage service cable to a concentrator at the transformer.

Benefit: No antenna, no spectrum, no operator. HPLC adds the rate for frequent interval data.

Trade off: Bounded by the transformer: every transformer area needs its own concentrator, and noise, poor joints and long branches weaken the signal.

A dual mode meter carries a radio as well and falls back to it where the cable fails.

03Cellular per meterNB-IoT · LTE-M · 4G

A modem and a SIM in every meter

Each meter links straight to the operator network. No concentrator.

Benefit: Every meter is individually reachable, wherever it stands, with headroom for frequent interval data and on demand reads.

Trade off: A data subscription per meter for the life of the asset, and the risk of the operator retiring the network the modem uses.

Budget the subscription over fifteen years, not one.

Utility head-end systemHES · MDMS · billingAll three routes deliver the same reading here. The route decides the equipment count, the running cost and what can fail.
When to choose · a working rule, confirmed by the communications study and the pilot
Meter density

Mesh needs neighbors and power line needs enough meters per transformer. Scattered meters point to cellular.

Low voltage network condition

Power line depends on the cable. Radio mesh and cellular do not.

Data volume and timing

Frequent interval data and on demand reads on large customers need cellular or high rate power line.

Dual modeWhere neither path alone is dependable, a meter carrying both power line and radio falls back without a truck roll. Ask for read success by path, not a blended average.

Patchy mobile coverageMesh or power line with a cellular concentrator: only one cellular link per area has to work.

Coverage radii are Comcore's published figures for its own equipment. The coverage that matters is the coverage measured in your pilot area.

Field notes · RF Mesh and supporting routesHow the flagship architecture adapts to field conditions
  1. A

    RADIO MESHMeters that relay for each other

    In a radio mesh (LoRa based or Wi-SUN, in the sub gigahertz bands) each meter can pass its neighbor's data along, so coverage grows by hops rather than by tower range, and no telecom operator is involved. It does not care what state the low voltage wiring is in. It does care about density: a meter with no neighbor in range has nobody to relay for it, and every hop adds delay and takes a share of the channel. A concentrator or collector with its own backhaul terminates the mesh.

    WHERE IT FITSSuits dense areas where the lines are long, tapped, mixed or storm damaged.

  2. B

    POWER LINE CARRIERData on the wires you already own

    Power line carrier (G3-PLC, or the higher rate HPLC variant) sends data along the low voltage conductors from the distribution transformer to the meter. No antenna, no spectrum, no operator. Its boundary is physical: the signal does not pass usefully through a transformer, so every transformer area needs its own concentrator or coupler, and the concentrator count follows the transformer count. It is sensitive to line noise, poor joints and long branch runs. The band plan is a specification item: G3-PLC has regional band plans, and the meter, the concentrator and any filters must all be on the same one.

    WHERE IT FITSSuits dense areas where the low voltage network is in good condition.

  3. C

    CELLULAR PER METERA modem and a SIM in every meter

    A cellular meter (NB-IoT, LTE-M or 4G) reaches the head-end system directly through the mobile operator, so no concentrator is needed and each meter is individually reachable. That suits scattered customers, bulk and check metering points and anything that needs frequent interval data. It depends entirely on the operator: coverage where the meter sits, a recurring data charge per meter for the life of the asset, and the operator's technology roadmap. Operators elsewhere in the region have retired older 2G and 3G networks and stranded meters built on them, so the offered module's bands and the operator's commitments belong in the compliance matrix.

    WHERE IT FITSSuits scattered customers and high value points. Budget the subscription over fifteen years, not one.

  4. D

    DUAL MODEWhen one path fails, use the other

    A dual mode meter carries both a power line and a radio module and falls back from one to the other when a link degrades. It costs more per meter and buys resilience in areas where neither path alone is dependable: a poblacion feeder with noisy lines and dense housing, for example. Whether it is worth it is a pilot question, answered by read success on the hard sections.

    HOW TO JUDGE ITAsk for read success by path, not a blended average.

Line drawing of a data concentrator cabinet at a distribution transformer, reaching nearby meters over the low voltage conductor and by radio, and the head-end server over 4G or Ethernet
TD12 hybrid data concentrator, one exampleDrawing, not to scale

The data concentrator

A field unit that does more than forward traffic

A data concentrator sits at the distribution transformer or on a nearby pole. On its downlink it polls or receives from the meters under it over power line or radio; on its uplink it talks to the head-end system over cellular or Ethernet. In between it buffers and timestamps the data and translates the meter protocol into the head-end system's transport. Because it sits at the transformer it is the natural place to meter the transformer's output, which is what gives loss analysis its supply figure. Four specification lines decide whether it earns its place.

  • Last gasp: when the supply fails, the unit sends a final message before it loses power, so the outage is known before customers call.
  • Backup power: a battery that keeps it reachable during the outage.
  • Modular communications: plug in radio or cellular modules, so a future technology change is a module swap rather than a unit replacement.
  • Encrypted links and its own tamper detection: because it is an unattended box on a pole.

Design noteA meter with its own cellular modem needs no concentrator. A design can mix both under one head-end system.

Quick reference · six field conditionsMatch the field condition to a route
What each field condition pushes the design toward. A working rule, confirmed by the communications study and the pilot.
Field conditionPushes towardBecause
Meters dense, low voltage lines in good conditionPower line carrierThe wires are the network; one concentrator per transformer
Meters dense, lines long, tapped, patched or noisyRadio meshCoverage comes from neighbors, not from the wiring
Meters scattered, long rural spans, islandsCellular per meterNo neighbors to relay and too few meters per transformer to justify a concentrator
Frequent interval data or on demand reads on large customersCellular or high rate power lineBandwidth and latency headroom
Coastal or island barangay with patchy mobile coverageMesh or power line with a cellular concentratorOnly one cellular link per area has to work
Neither path alone dependableDual modeFallback without a truck roll

Comcore publishes its own suitability guidance and coverage figures for each network family. Metro Power treats these as the principal's published figures; the coverage that matters is the coverage measured in your pilot area.

03How loss localization worksSupply minus consumption at one transformer, the three conditions it depends on, and the tamper points it can and cannot seeMethod

How loss localization works

Supply minus consumption, one transformer at a time.

The method behind AMI loss analysis is an energy balance drawn around each distribution transformer. Meter what the transformer delivered on its low voltage side over a period. For the same period, add up what every customer meter served by that transformer recorded. The difference is the energy that entered the area and was not billed: the area loss. Divide it by the supply and you have the area loss rate.

That remainder contains two kinds of loss. Technical loss is the energy spent heating conductors and connections, and the transformer's own losses if the metering point is on its high side. Non technical loss is everything else: bypassed meters, tampered meters, faulty meters, connections nobody recorded. A steady loss rate is mostly technical. A step change on one date points to a new theft or a meter that has failed. An area running far above similar neighboring areas is the one to send an inspector to first. AMI does not find the theft; it tells the inspector which transformer to start under.

Loss localization · the transformer area energy balanceDraw the boundary, then compare what went in with what was billed.
Example figures · not a project result

In this example the metering point at the transformer records 100 kWh. The four customer meters it serves record 25, 25, 25 and 5 kWh, 80 kWh in total. The 20 kWh difference, 20 percent of supply, is the unaccounted energy the investigation starts from.

Technical lossEnergy spent heating conductors, joints and connections, and the transformer's own losses when the metering point is on its high side.

Non technical lossBypassed, tampered or faulty meters and connections nobody recorded.

A steady rate is mostly technical. A step change on one date points to a new theft or a meter that has failed. AMI does not find the theft; it tells the inspector which transformer to start under.

What must be true

  1. 01

    Every meter mapped to its transformer

    The balance is only as good as the connectivity model. If a meter is recorded under the wrong transformer, its consumption is subtracted from the wrong area and both areas look wrong. This needs a maintained network model or GIS, reconciled during rollout and kept current after every reconnection.

  2. 02

    Reads aligned in time

    Supply and consumption must cover the same window. Interval data makes this straightforward; register reads work only if they are synchronized. A two hour offset between the transformer read and the customer reads produces a loss figure that means nothing.

  3. 03

    A transformer metering point you can trust

    The supply side of the balance is usually measured by the data concentrator at the transformer or by a check meter. That point needs the same accuracy and tamper protection as any revenue meter, because an error there appears as loss in every customer under it.

Water utilities do exactly this with a district metered area: a bulk meter on the inlet, customer meters inside the boundary, and a balance over aligned time windows. The Academy water lesson on measurement and district balance applies almost line for line to electricity, including its warning that a difference is a screening signal, not a conclusion.

Read the water treatment of the same method: Academy, Measurement, intervals and district water balance ↗
Tamper evidence · what the meter senses, and what only the data can showTwo layers of evidence: the meter records the condition, the data decides where to look.
Layer 01At the meter
  1. Terminal cover opened

    A switch or optical sensor sits under the terminal cover. Lifting the cover to reach the wiring writes a time stamped event.

  2. Meter cover opened

    A second sensor watches the main cover. Where the housing is ultrasonically welded, it cannot be opened and closed again without visible damage.

  3. Strong magnetic field

    A Hall sensor catches a magnet held against the case, the trick that once saturated the current sensors of older designs. An anti magnetic design uses sensors an external field does not affect.

TA18 single phase smart meter, front view, showing the display, the nameplate, the transparent terminal cover over the live and neutral terminals, and the cable glands below
TA18 single-phase electricity meter · product photograph
  1. Neutral missing or bypassed

    Cutting the neutral used to stop the register while the load ran on through an earth path. Neutral failure metering keeps measuring from the live side sensor alone, so the bypass yields no free energy, and the event is logged.

  2. Live and neutral current differ

    With a second current sensor on the neutral, the meter compares live and neutral current continuously. A mismatch means current is leaving by another path around the meter. This comparison is what a datasheet calls bypass detection.

  3. Reverse energy

    Energy registering in the wrong direction, as when the incoming and outgoing wires are swapped, is logged as a reverse energy event.

TC25E three phase four wire smart meter, front view
  1. Missing phase, three-phase meters

    A three-phase meter watches each phase voltage. A phase lost while load continues on the others is logged against that phase.

Also written to the event logClock changes, relay operations and failed communication attempts, each time stamped and able to raise an alarm.

Layer 02In the data
A · The event leaves the meter
  • Terminal cover open
  • Neutral missing
  • Current mismatch L / N

Each entry is time stamped in the meter's own log and can be pushed as an alarm, over the meter's cellular modem or through a data concentrator.

B · Head-end system

The head-end system receives the event and hands it to analytics with the meter's interval history.

C · Analytics sets it against two things
Daily consumptionEvent loggedConsumption behavior

Did this customer's consumption step down when the event was logged, against their own history and similar customers?

SuppliedBilledUnbilledTransformer area balance

Did the unbilled remainder under this transformer rise on the same date? The balance also shows what no meter reports: a connection made upstream of the meter.

D · A condition, not a verdictThe event starts an investigation.

Evidence agrees: a field inspection, a chain of custody for the event logs, then the utility's own disconnection and legal procedure.

Evidence does not: a fault, a wiring error or a real change in use. The record is closed with its reason.

Log entries and curves are illustrative, not records from a customer or a project.

The callouts describe detections an anti tamper meter can carry. Which of them a given model provides, and how each is reported, is set by its datasheet and its configuration, so confirm them in the specification. Design the response workflow before the alarms are switched on, or they become noise.

Systems loss above the regulator's cap is not recoverable in rates, which is why loss localization is usually the first business case for AMI. Metro Power does not state a target loss figure for any program; the result depends on the network model, the analytics and the field work that follows the evidence.

03Optional capability: prepaymentThe additional service, vending and customer-protection decisions needed only when prepaid service is part of the programOptional

Optional AMI capability

Prepayment is a service model, not the AMI network.

RF Mesh is the flagship communications architecture presented on this page. Prepayment is a separate, optional service capability that a cooperative may add when its policy, customer protections, vending operations and meter specifications support it. This chapter explains those additional decisions without presenting prepaid metering as Metro Power's primary AMI offer.

Two ways in, one meterIllustrative flow · sample token

Customer paysAt an office, an agent, a kiosk or on a phone. The vending system generates a 20-digit token for this one meter.

Path A · localWorks with no network at all

Receipt or phoneThe token reaches the customer5918 0264 7731
4402 6180

Keyed inOn the meter keypad or on the interface unit5918 0264 7731
4402 6180

Path B · remoteWorks only while the meter is reachable

Head-end system (HES)Receives the token from the vending system

AMI networkPushes it to the meter. No keypad entry.

The same meterValidates the token once only, and only on this meter, then adds the credit.

Single phase prepaid meter with a keypad on its face
Keypad meter, token keyed on its face
Split prepayment meter for sealed installation
Split meter, sealed away and paired to an interface unit
  • Remote: credit added on arrival
  • Local: credit added after entry

Specify both paths. The local path is the fallback for outages and dead spots; say which one is primary in each area.

As the credit runs downFour settings the cooperative decides
  1. Credit addedThe accepted token raises the balance. On a time-of-use tariff it drains faster at peak hours.
  2. Low credit warningStaged visible and audible warnings on the meter and the interface unit.SetThe warning levels and how many stages
  3. Emergency creditA small negative balance keeps the supply on. The next purchase recovers it.SetThe amount allowed
  4. Friendly hoursNo disconnection during set periods, such as nights, Sundays or holidays, even at zero credit.SetThe hours and the holiday calendar
  5. DisconnectionThe relay opens. Credit added closes it again.SetCustomer notice and reconnection rules

Each setting is a program decision written from the regulator's prepaid service rules and the cooperative's own policy. The meter enforces it; it does not choose it.

Six ideas · in depthWhat a cooperative decides before prepayment goes into a TOR
  1. 01

    THE TOKENA twenty-digit number that carries credit

    When a customer buys credit, the vending system encrypts the amount with a key that belongs to that one meter and stamps it with a time reference. The result is a numeric token. The meter decrypts it, checks it, and adds the credit. The format, the encryption and the life cycle of these tokens are defined by the Standard Transfer Specification, the IEC 62055-41 family, which is what the STS bullet on a meter datasheet refers to.

    Control pointA token is money in transit. Treat the vending system as a cash system.

  2. 02

    ONE METER, ONE USEWhy a token cannot be reused or shared

    Because the key is derived from the meter's own number, a token bought for one meter is meaningless to any other meter. Because the time reference is part of the encryption, the same token will not load twice on the meter it was sold for. A lost receipt is therefore a customer service problem, not a revenue leak. The same token mechanism also carries management instructions such as a key change, a tariff change or a maximum power limit, so the utility manages the meter with the same tool the customer uses.

    Control pointAsk how the bidder proposes to issue, hold and rotate meter keys.

  3. 03

    TWO WAYS INKeyed in by the customer, or pushed by the system

    On the local path the customer receives the token on a receipt or a message and keys it into the meter keypad or into a separate interface unit. This works with no network at all, which is why prepayment existed long before AMI. On the remote path the vending system hands the token to the head-end system, which sends it over the AMI network, and the customer does nothing. The remote path only works while the meter is reachable, so a program that depends on it needs the local path as its fallback for outages and dead spots.

    Control pointSpecify both paths and say which one is primary in each area.

  4. 04

    THE INTERFACE UNITWhat the customer holds when the meter is out of reach

    A customer interface unit is a small display and keypad in the customer's premises that talks to one meter over a short radio, Bluetooth or power line link. It shows remaining credit, warns when credit is low, accepts token entry and shows whether the meter accepted it. It is what makes split metering workable: the measuring unit can be sealed on the pole or in a shared box, and the customer still has a complete view of the account.

    Control pointEach unit is paired to its meter at installation. Plan for pairing, batteries and replacement.

  5. 05

    PROTECTING THE CUSTOMEREmergency credit and friendly hours

    A well specified prepaid meter warns in stages before it disconnects, with a visible and an audible signal. Emergency credit lets the customer draw a small negative balance, recovered from the next purchase, so a household is not cut off at night for want of a few pesos. Friendly hours suppress disconnection during defined periods such as night time, Sundays and holidays. In most regulated markets these are consumer protection requirements, not conveniences, so the cooperative's policy should be written from the regulator's prepaid service rules before the meter parameters are set.

    Control pointConfirm the current regulatory instrument before the policy is finalized.

  6. 06

    PREPAYMENT AND TIME-OF-USEDifferent prices at different hours, from a prepaid balance

    Prepayment and time-of-use tariffs can run together, but only if the meter holds the tariff tables, the daily time slots, any seasonal schedules and the holiday calendar, and keeps its clock accurate through outages. Credit then drains faster in peak hours and slower off peak. The vending system, the meter and the billing system must agree on the same tariff version, which is a change control question as much as a technical one.

    Control pointWhere a demand cap is wanted, a maximum power limit token can restrict rather than disconnect.

Feature sets vary by model and firmware. The exact prepayment functions, token logs, alarm stages and tariff capacity of any offered meter are confirmed in the project compliance matrix against the principal's published specification.

Metro Power AMPERE Protocol

Readiness before rollout.

AMPERE structures evidence, decision gates and accountable next actions before a utility treats AMI as a procurement or scaling exercise.

Explore the complete AMPERE framework ↗
  1. 01

    Assess readiness and maturity

  2. 02

    Establish the operating baseline

  3. 03

    Study communications and security

  4. 04

    Design and validate the pilot

  5. 05

    Prepare people and consumer operations

  6. 06

    Evaluate evidence before scale

Preliminary AMI evidence check

What evidence can your cooperative show today?

Choose the maturity of the current record for every area. The indication uses evidence quality and critical dependencies, not the number of checked categories. This is preparation guidance, not an AMPERE gate decision, project approval, product selection or certification.

How to classify your evidence

Use the status that describes the record you can show today.

Not available

No current information or record can be shown.

Identified

The likely owner or source is known, but the record is not controlled yet.

Documented

A current record exists, but its responsible source still needs verification.

Verified

The current record was checked with the responsible source.

0 of 6 areas answered0 of 6
01Meter populationNumber, service types, forms, voltage and class are recorded.
02Pilot areaA representative pilot area and consumer profile are defined.
03Communications evidenceCoverage, topology, density, interference or field conditions are recorded.
04Utility systemsBilling, CIS, HES, MDMS and integration requirements are recorded.
05Operating teamTechnical, commercial, ICT, customer and management owners are assigned.
06Success criteriaMeasurable technical, operating and consumer outcomes are recorded.

Pilot evidence at each handoff

Four handoffs a pilot must prove.

The RF Mesh scene illustrates how a reading can travel. This view asks what must be checked at the meter, across the field, in the data systems and with the people expected to act. Select a stage to inspect its evidence question.
RF MESH AMI SYSTEM · SYSTEM ILLUSTRATIONFLAGSHIP ARCHITECTURE · GUIDED EXAMPLE
Comcore TC25E smart meter with RF communications options, product photograph
COMCORE TC25E SERIES · RF COMMUNICATIONS OPTION

PILOT CHECK · METERProve the record exists. Confirm which registers, interval profiles and supported events the offered meter can provide, and whether its clock and configuration suit the intended use.

A pilot built to answer decisions

Do not pilot a quantity.
Pilot the system.

A credible AMI pilot tests representative field conditions and the complete operating chain. Its purpose is to reduce uncertainty before scale, not to create a small demonstration that avoids the difficult conditions.

  1. 01

    Frame the decision

    Agree on the operating problem, stakeholders, baseline and questions the pilot must answer.

  2. 02

    Represent reality

    Select service types, geography, communications conditions and consumer profiles that reflect rollout risk.

  3. 03

    Validate end to end

    Test meter, network, HES, MDMS, integrations, exceptions, workflows and support, not hardware alone.

  4. 04

    Measure against gates

    Use agreed methods for data delivery, billing acceptance, events, commands, ownership and issue closure.

  5. 05

    Decide responsibly

    Scale, redesign, extend or stop based on evidence, unresolved risks and lifecycle implications.

Relevant AMI equipment

Products follow the architecture.

The terms of reference (TOR), service configuration and communications study control final selection. These are starting points, not automatic recommendations.
  1. TC25E Series

    01Product photograph

    RF Mesh capable AMI applications

    TC25E Series

    Three-phase smart meterRF communications option • external load-switch control • GPRS, 4G or PLC options • IP66Review facts and selection gates ↗
  2. TD12

    02Pictorial drawing

    RF and PLC meter aggregation

    TD12

    Hybrid data concentratorRF or hybrid G3-PLC downlink • 4G or Ethernet uplink • last gasp and backup power per the principal's published specificationReview facts and selection gates ↗
  3. NA67 Series

    03Product photograph

    ANSI utility applications

    NA67 Series

    ANSI round smart meterAccuracy 0.2/0.5 stated • internal relay • multiple communicationsReview facts and selection gates ↗
  4. TA15 Series

    04Product photograph

    Residential connected metering

    TA15 Series

    Single-phase smart meterReplaceable communications module • outage recording • optional STS prepayment with multiple tariffsReview facts and selection gates ↗
  5. TA73 Series

    05Product photograph

    Conventional or connected

    TA73 Series

    Single-phase electronic meterCompact • internal relay • optical, RS485, RF, GPRS or Bluetooth optionsReview facts and selection gates ↗
03Evidence, clearly separatedWhat is principal deployment history, what is Metro Power accountability, and what still needs releaseEvidence

Evidence, clearly separated

Technology proof.
Local accountability.

Principal deployment history is not presented as a Metro Power installation. Our role is explicit.
Comcore reference
100,000 + 30,000 piecesMulti-brand AMI architecture. Documented Latin America case using MDMS, HES and multiple meter brands.
Comcore reference
4 million piecesDistributed AMI systems. Documented Guangxi case covering 40 AMI systems and more than 20 meter brands.
Metro Power delivery model
PHResponsible local execution. Readiness, TOR compliance, pilot design, logistics, commissioning coordination, training and principal escalation.

What makes multi-brand possible

Why multi-brand deployments are possible at all

The references above run several makers' meters under one platform because those meters share a data language. DLMS/COSEM, published as the IEC 62056 series, defines both how a meter organizes what it holds (energy registers, load profiles, the clock, the disconnect switch, each identified by a standard OBIS code such as 1-0:1.8.0 for total active energy imported) and how that data is exchanged over any link, from the optical port to power line, radio or cellular. A head-end system that speaks DLMS/COSEM can read a register on any conformant meter without custom work for each maker.

For a cooperative this is a procurement decision, not a technical footnote. A terms of reference that requires DLMS/COSEM conformance, with the certificate scoped to the offered model and firmware, keeps the second and third meter contracts open to competition and lets a pilot run on one brand scale on another. A terms of reference that names only a brand's own protocol chooses that brand for the life of the system. Certificates are issued by the DLMS User Association against a tested subset of the standard; ask for the certificate, and check that the model number on it is the model number being offered.

Quantities are stated in pieces by Comcore and come from Comcore's company profile. They are principal references, not Metro Power project claims.

Questions cooperative leaders usually ask

Before your first AMI decision.

Clear answers help management and engineering discuss the same project, not different versions of it.

01Is AMI the same as buying smart meters?

No. Smart meters are one field component. AMI also requires communications, HES, MDMS, integrations, cybersecurity, operating procedures and responsible ownership.

02Should we start with a pilot?

Usually, but only when the pilot has defined technical and operating questions, measurable success criteria and a decision gate for what happens next.

03Which communications technology should we specify?

Metro Power starts with RF Mesh as the primary field network. Nearby meters can relay information toward a data concentrator without depending on the condition of the low voltage conductors or requiring a mobile subscription in every meter. The communications study and pilot must still prove meter density, terrain, interference and hard-to-reach locations. PLC or cellular should support only the areas where that evidence shows another route is more responsible. The pilot area should include the hard sections, not only the poblacion.

04Can AMI reduce systems loss?

AMI can improve the evidence used to locate and manage loss. The result depends on data quality, network mapping, analytics and utility processes that act on the information.

05What does prepayment actually involve for the cooperative?

More than a meter with a keypad. You need a vending system that sells credit and generates tokens, a way to get each token to the customer (a receipt, a text message, a mobile wallet), a policy for emergency credit and for the hours when the meter must not disconnect, a process for the customer whose token is rejected, and someone who holds the meter keys. The meter can be a keypad meter on the wall or a split arrangement where the measuring unit is sealed out of reach and the customer holds a small interface unit. The Academy lesson on prepayment walks through each of these decisions.

06Can we buy meters from more than one maker?

Yes, if the terms of reference require the common meter data language. DLMS/COSEM, published as the IEC 62056 series, defines how a meter organizes its data and how a head-end system reads it, so one platform can manage meters from several makers. Ask each bidder for the conformance certificate that names the exact model and firmware. Without that requirement, the first meter contract also chooses every meter contract after it.

07What should we prepare for Metro Power?

Start with the meter population, service configurations, pilot geography, current reading and billing process, integrations, operating problems and desired outcomes.

Your AMI journey starts with evidence

Choose the next step
your cooperative is ready for.

Metro Power can begin with executive education, an AMPERE readiness workshop, pilot planning or formal TOR review. We will not force the project into the wrong stage.

Meter socket enclosure, product photograph
Product photographMeter enclosure