Conventional Electric Metering
Metering accessories
Project-configured
Sockets, bases, boxes and accessories matched to the approved installation.

PRODUCT IMAGE · 01/06Metering accessoriesProduct image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.
IMAGE REFERENCEProduct photographFor identification, not an installation. Ratings, dimensions, interfaces and compliance are confirmed from the applicable documents.
Metering accessories: what the design sets.
A project-configured item: its ratings come from the approved design, not from a published product sheet.
| Model | Project-configured |
|---|---|
| Type | Metering accessories |
| System family | Conventional Electric Metering |
| Set by the approved design |
|
Evidence level: project details needed. Confirm the exact model code, option, revision and controlling TOR before using any fact in a compliance statement, offer or installation decision.
The housing that makes a meter safe to install.
A base or enclosure sits between the service drop and the meter. It sets the socket or terminal arrangement, the sealing and the protection the meter relies on.

Power path
- Distribution transformerSteps the feeder down to the service voltage.

- This productMetering accessoriesHolds, seals and protects the meter at the service point.

- MeterMust match the socket or terminal form of the enclosure.

- Customer supplyThe service the meter bills.
What the enclosure must match
An enclosure is chosen after the meter, not before it.
- Meter form
Socket type for ANSI meters, or terminal and fixing pattern for panel meters.
- Service
Single-phase or three-phase, direct connected or CT operated.
- Site
Indoor or outdoor, pole or wall, and the sealing the utility requires.
Application context
Where this product fits.
Typical applications for this product family. Fit still depends on the exact service, duty, operating objective and approved configuration, so treat these as starting points rather than recommendations.
- 01Residential revenue metering
- 02Commercial and industrial accounts
- 03New service connections
- 04Meter replacement programs
- 05Loss-control programs
- 06Non-AMI utility deployments
Before an offer
What Metro Power confirms before Metering accessories is offered.
Four steps, in the order they happen: the evidence that identifies the exact unit, what the public record already shows, what your project must confirm, and the controlled documents that close the loop.
01Priority meter evidence package
A credible meter decision needs more than a polished front view.
Before a meter is offered, Metro Power assembles this evidence for the exact unit, from its identity through to project release. A photograph covers only the first line.
- 01IDENTITY
Front, nameplate and model identity matched to the offered unit
- 02FIT
Service form, voltage, current class, wiring and installation arrangement
- 03INTERFACES
Terminal, communications, relay, optical and accessory evidence as applicable
- 04AUTHORITY
Controlled datasheet, drawing, certificates and principal confirmation
- 05PROJECT RELEASE
Terms of reference (TOR) matrix, approved configuration, test evidence and offer revision aligned
02Professional documentation
One product identity. Five controlled evidence gates.
This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.
03Configuration gate
What must be confirmed before an offer.
Exact conventional-meter configuration, approvals, test evidence and accessory compatibility must be confirmed against the utility’s current controlling specification.
- 01Service voltage, frequency, phase and wire
- 02Meter form, class and current
- 03Socket or enclosure standard
- 04Accuracy and test requirements
- 05Required approvals and certificates
- 06Quantity, delivery and allocation schedule
04Controlled document request
Request a controlled offer.
Need the current datasheet or compliance evidence? Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.


