Water Metering & Intelligence
EUW110 / EUW210
Replaceable-battery ultrasonic water meter
Static ultrasonic meter for DN15 to DN40 with a replaceable dual battery. The EUW210 adds an integrated valve; the EUW110 has none.

PRODUCT IMAGE · 01/06EUW110 / EUW210Product image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.
IMAGE REFERENCEManufacturer product photographFor identification, not an installation. Ratings, dimensions, interfaces and compliance are confirmed from the applicable documents.
EUW110 / EUW210, as published.
Figures as Comcore publishes them.
| Model | EUW110 / EUW210 |
|---|---|
| Type | Replaceable-battery ultrasonic water meter |
| System family | Water Metering & Intelligence |
| Pipe size | DN15 to DN40 |
| Flow ratio | R250 or R400 (Q3/Q1); accuracy class 2 |
| Flow profile | U10D5 flow-profile class by default, U0D0 on option |
| Communications | NB-IoT, LoRa, LoRaWAN or infrared |
| Events and alarms | Hall and acceleration sensors raise an alarm if the case is opened or the meter is moved; dripping, constant-flow, reverse-flow and low-battery alarms |
| Battery | Replaceable dual battery, changed without interrupting supply, as published by Comcore |
| Ingress and environment | IP68 |
Evidence level: product reference available. Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.
Two meters, one district, and the water between them.
A bulk meter at the district inlet measures what goes in. Customer meters measure what is billed. The difference is the water the network loses or cannot account for.

Water path
- Bulk meter at the district inletMeasures what enters the district metered area.

- This productEUW110 / EUW210Measures what one account is billed.

- Customer premisesThe account the read is billed to.
Data path
- From the EUW110 / EUW210Reads, alarms and battery status.
- Gateway, for LoRa networksInstalled by the utility; cellular meters need none.
- Billing and network analysisBilling, leak alarms and district balance.
How reads leave the meter
Each route has a different cost and coverage question. The flags come from the options published for this model.
- NB-IoT or Cat.1 cellular
Reports through a mobile operator. No gateway to install, a subscription per meter, and signal must reach the meter box.
Published for this model - LoRa or LoRaWAN
Reports to gateways the utility installs and owns. No per-meter subscription; gateway placement needs a coverage survey.
Published for this model - Infrared, read on site
A reader collects data at the meter with a handheld. No network cost, and no remote alarms between visits.
Published for this model
The EUW110 / EUW210 on paper.
The outline an installer needs before the unit arrives, redrawn from the principal's published drawing. Confirm every figure against the controlled datasheet of the offered unit.
EUW110 and EUW210 outlines
Redrawn by Metro Power from the outline drawings Comcore publishes for the EUW110 and EUW210. Principal's published figures.
Product image, for identification- L is the overall length, L1 the body length between the threaded ends (EUW210), H the overall height and H1 the body height.
- L, L1, H and H1 change with the nominal size from DN15 to DN40, so they are given as symbols.
- The end view figures, 152 and 85, are the only values printed on the drawing.
- Dimension
- Extension line
Values per nominal size come from the principal's size table, which Metro Power supplies with the datasheet. No unit is printed; the figures read as millimeters.
Application context
Where this product fits.
Typical applications for this product family. Fit still depends on the exact service, duty, operating objective and approved configuration, so treat these as starting points rather than recommendations.
- 01Residential billing
- 02Commercial and industrial accounts
- 03District metered areas
- 04Bulk supply measurement
- 05Leakage and non-revenue water
- 06Remote reading
Before an offer
What Metro Power confirms before EUW110 / EUW210 is offered.
Three steps, in the order they happen: what the public record already shows, what your project must confirm, and the controlled documents that close the loop.
01Professional documentation
One product identity. Five controlled evidence gates.
This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.
02Configuration gate
What must be confirmed before an offer.
Exact diameter, flow range, battery, radio band and certifications are confirmed after project conditions are known.
- 01Pipe size, material and pressure
- 02Minimum, normal and peak flow
- 03Water quality, orientation and available straight run
- 04Battery expectation
- 05Coverage and read frequency
- 06Required certifications and billing integration
03Controlled document request
Request a controlled offer.
Need the current datasheet or compliance evidence? Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.
