Electric Metering & AMI

TD12

Hybrid data concentrator

Data concentrator installed at the distribution transformer: collects from compatible meters over hybrid power line and radio, meters the transformer output for area balance, and uplinks to the head-end system over cellular or Ethernet.

TD12, Studio view

PRODUCT DRAWING · 01/06TD12A line drawing made from the published facts, not a photograph. Confirm the exact model, ratings, dimensions and interfaces by document.

IMAGE REFERENCEPictorial drawingFor identification, not an installation. Ratings, dimensions, interfaces and compliance are confirmed from the applicable documents.

POSSIBLE USEAMI communications and remote meter-data collectionA starting point for discussion, not an automatic recommendation.
WHAT WE CAN CONFIRM TODAYTechnical sheet availablePublished technical details are available. Metro Power will still confirm the exact model and project configuration.
FIRST PROJECT CHECKControlling terms of reference (TOR) and meter populationIf you do not know this yet, Metro Power can help identify what is needed.
Published specifications

TD12, as published.

Figures from the current product reference.

TD12 published specifications
ModelTD12
TypeHybrid data concentrator
System familyElectric Metering & AMI
ProtocolsDLMS/COSEM support
Communications
  • Hybrid G3-PLC + RF downlink
  • 4G/GPRS + Ethernet uplink
Supply resilienceLast gasp, backup power and hot-plug communication modules, per the principal's published specification

Evidence level: technical sheet available. Confirm the exact model code, option, revision and controlling TOR before using any fact in a compliance statement, offer or installation decision.

Where a data concentrator sits in the reading chain.

A concentrator gathers reads and events from the meters of one area and passes them to the head-end system. Without it, each meter needs its own link to the utility.

Illustrative evening scene of distribution lines and a substation above a coastal town
Illustrative scene, not a Metro Power site or installation.

Data path

  1. Single-phase metersResidential services on the same area.
  2. Three-phase metersCommercial and larger services.
  3. This product · pictorial drawing

    TD12

    Collects and forwards reads, events and commands for its area.

    TD12, pictorial drawing at full size
    A line drawing made from the published facts, not a photograph. It shows the general form of the equipment, not an exact product view.
    This productTD12Collects and forwards reads, events and commands for its area.
  4. Pictorial drawing

    Head-end and MDMS

    The head-end gathers reads; meter data management validates them for billing.

    Head-end and MDMS, pictorial drawing at full size
    A line drawing made from the published facts, not a photograph. It shows the general form of the equipment, not an exact product view.
    Head-end and MDMSThe head-end gathers reads; meter data management validates them for billing.

Where it is installed

  1. Distribution transformerA concentrator usually serves the meters fed from one transformer area.
  2. From the TD12Powered from the low-voltage side it reads.
PowerDataReal product photographDrawn: equipment Metro Power does not supplyDrawn: supplied, with no published photograph
Options and differences

Three ways reads reach the utility

The network design decides whether a concentrator is needed at all.

  • This productThrough a data concentrator

    Meters talk over power-line carrier or radio to a concentrator for their area; one backhaul link serves many meters. Suits dense service areas.

  • Direct cellular

    Each meter carries its own cellular module and reports straight to the head-end. No field collection hardware, but a data plan per meter and signal at every service point.

  • Read on site

    An optical port read with a handheld. No network cost, and no remote reads, alarms or relay control between visits.

Application context

Where this product fits.

Typical applications for this product family. Fit still depends on the exact service, duty, operating objective and approved configuration, so treat these as starting points rather than recommendations.

  1. 01Automated billing reads
  2. 02Loss analysis
  3. 03Load profiling
  4. 04Outage and event visibility
  5. 05Remote service operations where enabled
  6. 06Phased utility modernization

Before an offer

What Metro Power confirms before TD12 is offered.

Four steps, in the order they happen: the evidence that identifies the exact unit, what the public record already shows, what your project must confirm, and the controlled documents that close the loop.

01Priority meter evidence package

A credible meter decision needs more than a polished front view.

Before a meter is offered, Metro Power assembles this evidence for the exact unit, from its identity through to project release. A photograph covers only the first line.

  1. 01IDENTITY

    Front, nameplate and model identity matched to the offered unit

  2. 02FIT

    Service form, voltage, current class, wiring and installation arrangement

  3. 03INTERFACES

    Terminal, communications, relay, optical and accessory evidence as applicable

  4. 04AUTHORITY

    Controlled datasheet, drawing, certificates and principal confirmation

  5. 05PROJECT RELEASE

    TOR matrix, approved configuration, test evidence and offer revision aligned

02Professional documentation

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
IdentityTD12 · Hybrid data concentratorExact model code, production revision and option scheduleTechnical sheet available
ApplicationData concentrator installed at the distribution transformer: collects from compatible meters over hybrid power line and radio, meters the transformer output for area balance, and uplinks to the head-end system over cellular or Ethernet.Approved service, duty, site and operating useApplication review
Technical factsHybrid G3-PLC + RF downlink · 4G/GPRS + Ethernet uplink · Last gasp, backup power and hot-plug communication modules, per the principal's published specification · DLMS/COSEM supportControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
Information to prepareControlling terms of reference (TOR) and meter population · Service type, voltage, frequency, form and class · Pilot geography and communications study · Billing and customer information system (CIS) integration requirements · Cybersecurity and data rules · Success measures and rollout gateDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyNot shown on this pageCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

03Configuration gate

What must be confirmed before an offer.

Exact form, class, voltage, current, reference frequency, relay, protocol, communications, certification and firmware are confirmed in a project compliance matrix.

  1. 01Controlling terms of reference (TOR) and meter population
  2. 02Service type, voltage, frequency, form and class
  3. 03Pilot geography and communications study
  4. 04Billing and customer information system (CIS) integration requirements
  5. 05Cybersecurity and data rules
  6. 06Success measures and rollout gate

04Controlled document request

Request a controlled offer.

Need the current datasheet or compliance evidence? Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.