EV Charging Infrastructure

DC fast charger, 30 to 60 kW

BSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCC

Single-cabinet DC fast charger for workplaces, retail and smaller public sites, published by Bescore as the Fast EV charger (EU).

Bescore's web page and datasheet differ on the model code, ingress rating and connectors, so Metro Power confirms the exact configuration for each project.

BSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCC, Studio view

PRODUCT IMAGE · 01/06BSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCCProduct image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.

IMAGE REFERENCEManufacturer product renderFor identification, not an installation. Ratings, dimensions, interfaces and compliance are confirmed from the applicable documents.

POSSIBLE USEFleet depots, charging hubs and public fast-charging sitesA starting point for discussion, not an automatic recommendation.
WHAT WE CAN CONFIRM TODAYAvailability needs checkingThis may suit the need, but Metro Power must reconfirm the current model, configuration and availability.
FIRST PROJECT CHECKVehicle list with each model's DC and AC inlet type and battery voltage classIf you do not know this yet, Metro Power can help identify what is needed.
Published specifications

DC fast charger, 30 to 60 kW, as published.

Figures as Bescore publishes them.

BSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCC published specifications
ModelBSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCC
TypeDC fast charger, 30 to 60 kW
System familyEV Charging Infrastructure
Power and energy30, 40 or 60 kW output
DC voltage150 to 1,000 V DC
ConnectorsCCS2 on the datasheet, with CHAdeMO and CCS1 shown on the web page
ProtocolsOpen Charge Point Protocol (OCPP) 1.6 JSON, the standard that lets a charger talk to a management platform
CommunicationsEthernet, 4G, Wi-Fi, RFID, QR code
Ingress and environmentIP54 or IP55 depending on the source; -35 to 55 °C on the datasheet

Evidence level: availability needs checking. Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.

The charger is the last item on the supply.

The site's transformer and protection set what any charger can deliver. Moving up a power tier usually changes the site before it changes the charger.

Illustrative evening scene of a covered charging area with vehicles at DC chargers
Illustrative scene, not a Metro Power site or installation.

Power path

  1. Utility supplyThe service capacity sets the ceiling.
  2. Site transformerIts rating decides how many chargers run at full power.
  3. Switchgear and protectionProtection, earthing and cabling are checked at energisation.
  4. This productBSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCCConverts site power to what the vehicle inlet accepts.
PowerReal product photographDrawn: equipment Metro Power does not supply
Options and differences

Four power tiers, four different sites

Photographs are the principal's product images. The tier follows dwell time and the vehicles on site.

  • AC, up to 22 kW

    Longer-stay parking. The vehicle's onboard charger sets the speed; a branch circuit usually serves it.

  • This productDC, 30 to 60 kW

    Workplaces, retail and smaller public sites. A three-phase service, checked against the existing load.

  • DC, 120 to 360 kW

    Hubs, fleets and highway sites. Usually a transformer review or a dedicated supply.

  • Split DC, 360 to 720 kW

    High-throughput sites. A power cabinet feeding separate terminals, each up to 500 kW.

Application context

Where this product fits.

Typical applications for this product family. Fit still depends on the exact service, duty, operating objective and approved configuration, so treat these as starting points rather than recommendations.

  1. 01Home and condominium
  2. 02Workplace/destination
  3. 03Fleet depots
  4. 04Cooperative charging hubs
  5. 05Highway/public fast charging
  6. 06Retail and mixed use

Before an offer

What Metro Power confirms before BSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCC is offered.

Three steps, in the order they happen: what the public record already shows, what your project must confirm, and the controlled documents that close the loop.

01Professional documentation

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
IdentityBSC-F03BC / BSC-F03BCC / BSC-F04BCC / BSC-F06BCC · DC fast charger, 30 to 60 kWExact model code, production revision and option scheduleAvailability needs checking
ApplicationSingle-cabinet DC fast charger for workplaces, retail and smaller public sites, published by Bescore as the Fast EV charger (EU). Bescore's web page and datasheet differ on the model code, ingress rating and connectors, so Metro Power confirms the exact configuration for each project.Approved service, duty, site and operating useApplication review
Technical facts30, 40 or 60 kW output · 150 to 1,000 V DC; CCS2 on the datasheet, with CHAdeMO and CCS1 shown on the web page · Open Charge Point Protocol (OCPP) 1.6 JSON, the standard that lets a charger talk to a management platform; Ethernet, 4G, Wi-Fi, RFID, QR code · IP54 or IP55 depending on the source; -35 to 55 °C on the datasheetControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
Information to prepareVehicle list with each model's DC and AC inlet type and battery voltage class · Energy per vehicle per day and required departure time · Dwell time and turnaround · Transformer/service capacity · Single-line and load profile · Parking, trenching and cable routes · Permits, payment and operating model · Earthing arrangement and available protection at the supply boardDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyNot shown on this pageCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

02Configuration gate

What must be confirmed before an offer.

Transformer upgrades, cabling, switchgear, protection, civil works, permits and demand charges may outweigh charger cost; Metro Power evaluates the whole site. The connector family is fixed by the vehicles, not by preference, and is confirmed from the fleet survey before any charger is proposed.

  1. 01Vehicle list with each model's DC and AC inlet type and battery voltage class
  2. 02Energy per vehicle per day and required departure time
  3. 03Dwell time and turnaround
  4. 04Transformer/service capacity
  5. 05Single-line and load profile
  6. 06Parking, trenching and cable routes

03Controlled document request

Request a controlled offer.

Need the current datasheet or compliance evidence? Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.