BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC, integrated dc fast charger, lit on a dark floor
BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCCProduct image, AI-lit from manufacturer photograph, not an installationSpecifications are confirmed from documents, never read from this image.

EV Charging Infrastructure

Integrated DC fast charger

BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC

Integrated DC charger family from 30 to 180 kW, as listed on an earlier Bescore datasheet.

These codes do not appear on Bescore's current site, which lists the 30 to 60 kW fast charger and the 120 to 360 kW super charger shown separately here, so Metro Power reconfirms the current model before an offer.

Manufacturer photograph

Inspect the product itself.

The image above is AI-lit from this manufacturer photograph for presentation, and no specification is read from it. Use the six views to inspect the manufacturer image, its close view, interfaces, system context, drawing gate and evidence boundary.

BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC, Studio view

PRODUCT IMAGE · 01/06BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCCProduct image from the available source. Confirm the exact model, ratings, dimensions and interfaces by document.

IMAGE REFERENCEManufacturer renderRatings, dimensions, interfaces and compliance are confirmed from the applicable documents.

POSSIBLE USEFleet depots, charging hubs and public fast-charging sitesA starting point for discussion, not an automatic recommendation.
WHAT WE CAN CONFIRM TODAYAvailability needs checkingThis may suit the need, but Metro Power must reconfirm the current model, configuration and availability.
FIRST PROJECT CHECKVehicle list with each model's DC and AC inlet type and battery voltage classIf you do not know this yet, Metro Power can help identify what is needed.
Published specifications

Integrated DC fast charger, as published.

Figures as Bescore publishes them.

BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC published specifications
ModelBSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC
TypeIntegrated DC fast charger
System familyEV Charging Infrastructure
Power and energy30, 60, 80, 120, 160, 180 kW, per the earlier datasheet
DC voltage150 to 1,000 V DC
ConnectorsCCS2 and configured dual output
ProtocolsOpen Charge Point Protocol (OCPP) 1.6J and IP55, per the earlier datasheet

Evidence level: availability needs checking. Confirm the exact model code, option, revision and controlling terms of reference (TOR) before using any fact in a compliance statement, offer or installation decision.

The charger is the last item on the supply.

The site's transformer and protection set what any charger can deliver. Moving up a power tier usually changes the site before it changes the charger.

Illustrative evening scene of a covered charging area with vehicles at DC chargers
Illustrative scene, not a Metro Power site or installation.

Power path

  1. Utility supplyThe service capacity sets the ceiling.
  2. Site transformerIts rating decides how many chargers run at full power.
  3. Switchgear and protectionProtection, earthing and cabling are checked at energisation.
  4. This productBSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCCConverts site power to what the vehicle inlet accepts.
PowerReal product photographDrawn: equipment Metro Power does not supply
Options and differences

Four power tiers, four different sites

Photographs are the principal's product images. The tier follows dwell time and the vehicles on site.

  • AC, up to 22 kW

    Longer-stay parking. The vehicle's onboard charger sets the speed; a branch circuit usually serves it.

  • DC, 30 to 60 kW

    Workplaces, retail and smaller public sites. A three-phase service, checked against the existing load.

  • DC, 120 to 360 kW

    Hubs, fleets and highway sites. Usually a transformer review or a dedicated supply.

  • Split DC, 360 to 720 kW

    High-throughput sites. A power cabinet feeding separate terminals, each up to 500 kW.

Application context

Where this product fits.

Typical applications for this product family. Fit still depends on the exact service, duty, operating objective and approved configuration, so treat these as starting points rather than recommendations.

  1. 01Home and condominium
  2. 02Workplace/destination
  3. 03Fleet depots
  4. 04Cooperative charging hubs
  5. 05Highway/public fast charging
  6. 06Retail and mixed use

Before an offer

What Metro Power confirms before BSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC is offered.

Three steps, in the order they happen: what the public record already shows, what your project must confirm, and the controlled documents that close the loop.

01Professional documentation

One product identity. Five controlled evidence gates.

This schedule shows what the public record supports and what Metro Power must still match before the product becomes a technical or commercial commitment.

ControlCurrent public recordProject release requirementStatus
IdentityBSC-S03CCN / S06CCC / S08CCC / S12CCC / S16CCC / S18CCC · Integrated DC fast chargerExact model code, production revision and option scheduleAvailability needs checking
ApplicationIntegrated DC charger family from 30 to 180 kW, as listed on an earlier Bescore datasheet. These codes do not appear on Bescore's current site, which lists the 30 to 60 kW fast charger and the 120 to 360 kW super charger shown separately here, so Metro Power reconfirms the current model before an offer.Approved service, duty, site and operating useApplication review
Technical facts30, 60, 80, 120, 160, 180 kW, per the earlier datasheet · 150 to 1,000 V DC · CCS2 and configured dual output · Open Charge Point Protocol (OCPP) 1.6J and IP55, per the earlier datasheetControlled datasheet and requirement-by-requirement compliance matrixConfiguration check
Information to prepareVehicle list with each model's DC and AC inlet type and battery voltage class · Energy per vehicle per day and required departure time · Dwell time and turnaround · Transformer/service capacity · Single-line and load profile · Parking, trenching and cable routes · Permits, payment and operating model · Earthing arrangement and available protection at the supply boardDrawings, terminals, communications, accessories and system interfacesEvidence required
Approval and supplyNot shown on this pageCurrent certificates, test records, principal confirmation, availability and deliveryRelease before offer

02Configuration gate

What must be confirmed before an offer.

Transformer upgrades, cabling, switchgear, protection, civil works, permits and demand charges may outweigh charger cost; Metro Power evaluates the whole site. The connector family is fixed by the vehicles, not by preference, and is confirmed from the fleet survey before any charger is proposed.

  1. 01Vehicle list with each model's DC and AC inlet type and battery voltage class
  2. 02Energy per vehicle per day and required departure time
  3. 03Dwell time and turnaround
  4. 04Transformer/service capacity
  5. 05Single-line and load profile
  6. 06Parking, trenching and cable routes

03Controlled document request

Request a controlled offer.

Need the current datasheet or compliance evidence? Metro Power will match the document revision, model and configuration to your requirement before release. Tell us the decision, TOR or application the document must support.